• June

    30

    2025
  • 2
  • 0

Preparation is Key

This is a small bathroom It started with a regular 5feet wide X 9 feet long with a little linen closet behind the door. I removed that to make room to recess the vanity cabinet (to the left of the picture) 2 feet and change the floor plan to accommodate the separation of the toilet (to the right of the picture) and shower. Zero entry shower base made it easy the get in and out with a wheelchair if needed. I basically made the whole bathroom floor into a shower base so all water runs towards the linear drain at the back wall. The work took me about 2 weeks to complete and the homeowners are very happy with their new bathroom. I was in and out quickly due to the preparation for the project. Make sure you have everything you need to complete the project before you start. You will never regret being prepared.

Thank you for reading this I hope it was helpful Theguyforthat.com

LEAVE A COMMENT

You comment will be published within 24 hours.

Cancel reply

COST CALCULATOR

Use our form to estimate the initial cost of renovation or installation.

REQUEST A QUOTE
Latest Posts
Most Viewed
Text Widget

Here is a text widget settings ipsum lore tora dolor sit amet velum. Maecenas est velum, gravida Vehicula Dolor

The Guy For That, LLC BBB Business Review
© Copyright 2017 The Guy For That | All Rights Reserved